RES Knowledge Center

Civil & structural engineering resources

Planning a wall removal? Watching a basement crack? Find out what to photograph, what records to gather, and what to ask an engineer.

Explore project guides Preparation guides

What brings you here?

Browse all 42 resources

Document a concern

Bring a clear account of what you see at the property.

A crack in a basement wall

Note which wall has the crack, when you first saw it, and whether you have an older photo of the same spot. If you can take photos from a safe location, pair a room view with a close-up so the engineer can place the detail in context.

Water pooling after rain

Where does water first collect, and where does it go? A sketch showing the house, downspouts, pavement, and low spots can be more useful than a close-up of a puddle. Note when the rain stopped and how long the water stayed.

A proposed crack or epoxy repair

Bring the contractor’s written proposal and mark the locations it covers. Tell RES what you want the repair to accomplish, such as stopping a leak, and what led you to ask for a second opinion.

Plan a project

Describe what you want to change and what needs to stay.

An addition or wall removal

Sketch the rooms as they are today and the layout you want. Mark the wall or opening in question and note what occupies the floors above and below. If a flush ceiling or an uninterrupted opening matters, include that on the sketch.

A deck, retaining wall, or waterfront project

Mark the proposed work on a survey or sketch and show how it relates to the building, property lines, and nearby improvements. For work along the water, include any survey or permit records you already have.

Materials and layout preferences

List the features that matter most to you. For example, exposed wood might be a preference while clearance for a garage door is a firm requirement. A short list helps the design conversation start with the choices that affect you.

Prepare for a review

Organize the information an engineer or reviewer has asked for.

Your first engineering consultation

Start with the property location and one sentence about the decision you need to make. If someone requested an engineer’s letter, drawings, or a report, include their wording and the date they need an answer.

A permit comment or correction

Keep the comment in its original wording, along with the agency name, permit number, and drawing revision it refers to. If you are unsure which office reviews your address, record the parcel number and the agency that confirms it.

A commercial or industrial alteration

Mark the affected area on a floor plan. Describe the change in use or equipment, how people access the area, and when work can take place. Existing drawings and equipment information give the engineer a place to start.

Before You Contact RES

Start with what you know. A short description and the property location are enough for us to begin.

What to include in your inquiry

  • Where is it? Give the street address or the city and state if you do not have an address yet. Add the unit, building, or area if it matters.
  • What do you need help with? Describe what you noticed or what you want to change. Tell us what you need to decide, design, or get reviewed.
  • What stage is it at? Tell us whether you are planning, applying for a permit, under construction, or dealing with an existing issue.
  • Is there a deadline? Give the date and what is driving it, such as a permit response or scheduled construction.

Add details for your type of project

  • Foundation, cracks, or water. Tell us where you see it, when it started, and what has changed. Mention whether the water shows up after rain, if you know.
  • Remodel or addition. Describe what stays and what changes. Mention an existing plan, proposed sketch, or opening dimensions if you have them.
  • Pool or retaining wall. Describe where the work will sit. Mention a nearby slope, building, or wall, and whether a pool shell or system has already been selected.
  • Seawall or dock. Tell us which part of the shoreline is involved and what you noticed. Mention a dock, lift, or nearby structure if it is part of the work.
  • Permit or inspection. Share the wording of the request, permit number if known, and any due date. For a missed inspection, say what is still visible and what has been covered.

Sample inquiry. I’m planning a rear addition in Lakewood, Colorado. We have a floor-plan sketch and need structural drawings for the permit. We hope to submit in January.

Mention any photos, plans, or notices you already have. RES can let you know how to send them.

Start an inquiry

Project Photo Guide

Use existing, accessible viewpoints. A few photos that show where and what you noticed are useful.

Take three views

  • Wide. Show the whole wall, room, yard, or shoreline so we can see the issue in context.
  • Mid-range. Show the affected area and something that locates it, such as a corner, door, window, or downspout.
  • Close-up. Show the feature itself in focus. Include a familiar object for scale if you can place one from an accessible spot.

What to show for your type of project

  • Cracks or water. Show the full wall and where it meets the floor. If relevant and accessible, show the ground or downspout on the other side.
  • Remodel or addition. Show the area to be changed and, where accessible, the space on either side. Photograph framing that is already exposed.
  • Pool, drainage, or retaining wall. Take a side view showing the slope, nearby buildings or walls, and where water appears to collect or flow.
  • Seawall or dock. From land, show the affected section and adjacent wall. Include where the wall meets the yard and any dock or lift involved.

Label the photos

  • Location and date. A note like “01 — north basement wall by window, November 19” ties the image to the right spot.
  • Timing and changes. Note what you observed, such as “first noticed after rain” or “looks wider than last month.” Keep the original files.

Email the original photo files to your RES contact, or upload them through Ask RES when the upload option is available. Please do not send photos by text message.

Print a preparation guide

Browse the Knowledge Center

42 resources

Guides

Preparing for a Structural Engineering Consultation

A useful first conversation starts with what you want to accomplish. You do not need to identify the right beam, name the cause of a crack, or arrive with a complete design. Explain the change or concern, show the setting, and say what decision you need help making.

Start with the outcome

Try one sentence: “We want to connect these two rooms,” “We need to understand the cracking before buying the house,” or “We want contractors to price the same drainage work.” These are illustrative situations, not RES project accounts.

Add the property location, how the building is used, and whether you are planning work, responding to permit comments, or investigating an existing condition. If you have a deadline, explain what creates it. A purchase inspection period and a preferred construction date are different constraints. Sharing a date does not reserve an appointment or establish a delivery commitment.

Say what you need in writing

A conversation, an observation letter, a condition report, and construction drawings serve different purposes. Tell RES who will use the deliverable and what they need to decide. A contractor pricing repairs may need a defined scope. A building reviewer may need drawings, calculations, or a response to a particular comment. Bring the actual request when one exists.

Avoid relying on “whatever the city needs” when you already have a correction notice. The exact wording helps the project team identify the discipline, the missing document, and any information that must come from another consultant. Ask for the proposed scope to identify both the deliverable and the questions it will address.

Gather a small, organized record

Useful starting material includes existing plans, a survey, prior engineering or home-inspection reports, proposed sketches, selected product information, and permit correspondence. Send what you already have. Mark missing records as unknown rather than filling gaps with estimates presented as facts.

For photographs, provide an overall view, a closer view that locates the concern, and a detail when safe. Add a date and a simple location label. Keep original files. For flood damage, FEMA recommends photographing or filming conditions before cleanup once safe access is established. That guidance does not authorize entering a damaged building. [S-FEMA]

Explain access and responsibilities

Describe occupied areas, tenant coordination, locked spaces, or surfaces concealed by finishes. State what can be seen from ordinary accessible locations. Do not remove finishes, enter a crawlspace with suspected hazards, or expose structural components just to complete an inquiry.

Identify the owner, architect, contractor, and person coordinating access. For associations, name the person who can confirm the requested scope. For a purchase, explain who will arrange seller permission. A short list of decision-makers can prevent an otherwise clear technical request from becoming a scheduling puzzle.

Separate essentials from preferences

An open room, a flush ceiling, exposed timber, limited demolition, and a fixed construction window may compete with one another. Mark each item as essential, preferred, or open to advice. If you have already selected a pool system, railing, equipment model, or finish, provide its name and current documentation.

Before accepting a proposal, check that it describes the agreed question, deliverable, information needed from you, and any separately scoped services. Fees, timing, additional visits, and permitting responsibilities belong in that project agreement.

Next step: Use the existing Project Planner to organize your inquiry, or send the project goal and available records through Contact. Ask RES to confirm the scope and next step.

Source note: FEMA Flood Recovery Checklist supports the flood-documentation passage. Other preparation steps are original editorial suggestions awaiting RES review; they are not a published service contract.

Planning an Addition or Wall Removal

Before choosing a beam or moving a wall, describe the space you want and the parts of the building that would change. A useful design brief connects the proposed opening to the floors, roof, supports, and foundations around it.

Show the whole change

A sketch can communicate the intended opening, the rooms on either side, and the preferred finished appearance. Include approximate dimensions if known, clearly labeled as preliminary. If an architect has drawings, share the current set and its revision date. Identify anything already demolished or temporarily supported.

For an addition, show where new construction meets the existing building. Describe the intended use, the number of levels, and whether the work includes a deck, roof extension, basement work, or changes to exterior grades. These are scope questions, not a substitute for measured drawings.

Explain what is above and below

The engineering question extends beyond the visible opening. Loads need a continuous route through supporting members and connections to the foundation. Ask the design team to identify what existing information is sufficient and what must be verified. Photographs of accessible framing may help explain the arrangement, but the engineer must determine whether they establish the necessary facts.

Do not decide that a wall is nonbearing from its direction or appearance alone. An existing drawing is useful evidence, but it also needs to be compared with the building. A prior alteration may have changed the support arrangement without appearing on the records you have.

Describe the finished-space priorities

Tell RES whether a dropped beam is acceptable, where posts would interfere with circulation, and whether exposed structure is part of the design. Include nearby doors, windows, stairs, mechanical equipment, and features you want to retain. A preferred material should be listed as a preference until the project team confirms it.

For example, “We prefer a clear opening and can accept a visible beam” gives a different starting point from “The ceiling must remain flush and a post is acceptable at one end.” Neither statement establishes which solution will work, but both help prevent design around an unstated assumption.

Keep construction sequencing in the conversation

Permanent framing design and temporary support during construction are related questions. Ask who will define any required temporary-support design, installation sequence, and field verification. The answer belongs in the project scope and construction documents. Do not remove a member or improvise shoring while waiting for the final design.

Let the team know if the building must remain occupied or if access is restricted. These constraints may affect how the work can be investigated and constructed even when the finished layout is straightforward.

Bring the permit context

Provide the property address, known jurisdiction, permit number if one exists, and complete reviewer comments. Requirements depend on the authority, project type, and applicable code period. Jefferson County’s commercial supplement, for example, addresses professional preparation and supporting submittals in Section 107.1, including a building-official waiver provision. That is a jurisdiction-specific example, not a rule to apply to every home remodel. [R-JEF-DOCS]

Next step: Send the proposed layout, available existing plans, accessible photographs, and a short list of ceiling and support preferences. Ask RES to identify the information needed to define a design scope.

Source note: Jefferson County 2024 Supplements, Section 107.1, supports the local submittal example. The planning discussion is original editorial guidance awaiting technical review.

How to Explain Your Structural Material Preferences

“We prefer steel” is a useful start. “We want a shallow beam, a clear opening, and minimal disruption to the room above” is more useful still. Explain the result you are seeking so the design team can evaluate materials against the actual project.

Describe the reason behind the preference

You may prefer wood for appearance, steel for a particular architectural concept, or a specific wall or pool system because your contractor regularly installs it. Share that reason and any product information you already have. A familiar system may simplify coordination, but familiarity alone does not establish suitability for the property.

Make a short list of what matters most: finished depth, exposed appearance, access, maintenance, construction sequence, budget, or the ability to keep part of the building in use. Rank a few priorities rather than marking every item essential.

Compare complete systems

A structural choice includes more than the main member. Connections, supporting construction, foundations, protective details, and installation access can influence the final arrangement. Ask the project team to compare options at a similar level of completeness before comparing prices.

A quoted beam price, for example, may exclude fabrication, connections, delivery, lifting, temporary support, or finishes. This is a comparison prompt, not a prediction that one material will cost more. Ask what each contractor’s number includes and what assumptions still need confirmation.

Use three decision labels

Mark each preference as essential, preferred, or open to advice. “No visible post in this doorway” may be essential. “Exposed wood finish” may be preferred. “Beam material” may be open to advice. If two essentials conflict, the design conversation can address that early.

Identify who can make each decision. An owner may approve appearance while the contractor confirms installation access and a manufacturer supplies system limits. Avoid treating an informal conversation as final approval of a substitution.

Record products precisely

For a proprietary system, provide the manufacturer, model, current drawings, and available evaluation or approval documents. “Fiberglass pool” or “metal railing” is not enough to identify the specific product. Tell RES whether it has already been ordered and which parts of the installation the supplier has designed.

Product documentation also has an applicability boundary. Miami-Dade’s product-approval advisory explains that an NOA identifying a code edition is tied to applications under that edition. The project team still needs to review the actual document and its limits. [R-MD-NOA]

Revisit changes before purchase or installation

Once drawings are issued, a change in material, model, dimensions, or support arrangement can affect more than the item being replaced. Send the proposed change with the original reference, the reason, and available supplier information. Ask who must review it and whether revised documents or permit coordination are needed.

Keep a simple decision log with the item, selected option, date, responsible person, and unresolved questions. Include the revision of any drawing or product sheet used in the decision. This makes it easier for everyone to work from the same information when pricing, ordering, and construction occur at different times.

Next step: Complete the Design Decision Sheet and attach the relevant product information to your project inquiry. Keep unknown items visible rather than guessing.

Source note: Miami-Dade NOA advisory, January 3, 2024 supports the code-edition example. The comparison and decision-log workflow is proposed RES editorial guidance.

How to Describe a Crack Without Guessing the Cause

When you notice a crack, the most useful first step is to describe what you can see and what has changed. A photograph can help start that conversation. It cannot, by itself, establish the cause, the required repair, or whether the structure is safe.

Locate the concern

Identify the room, wall, slab, beam, or exterior area. State the visible material if you know it. A crack in paint, a mortar joint, and a concrete member are different observations even when their shapes look similar. If the material is uncertain, say so.

Take a wider photograph that shows the setting before taking a close-up. Nearby openings, corners, adjacent surfaces, or visible water staining may help explain the location. Leave concealed or inaccessible areas undocumented and describe the access limitation.

Use shape as a description

Terms such as vertical, diagonal, horizontal, stair-step, and branching can make a report easier to understand. They describe appearance. They are not a severity scale or a diagnosis.

For a stair-step pattern in masonry, show the joints and nearby units. For a line beside a window, show the whole opening. If surfaces appear offset, describe the visible offset without pressing on or disturbing the material. If pieces are missing, record that separately from the crack pattern. These examples help organize an inquiry; they do not identify a particular failure mechanism.

Describe time and change

Record when you first noticed the condition and whether you have earlier photographs. Distinguish “first noticed today” from “formed today.” Note changes in water exposure, visible alignment, or the operation of nearby doors and windows without assuming they share a cause.

If you can safely take repeat photographs from the same accessible position, label them consistently. Do not rely on the apparent size of a crack in differently scaled photographs as a precise movement measurement. Ask an engineer whether a formal monitoring method is appropriate.

Keep measurements honest

An object of known size can provide context in a photograph when it can be placed safely. Record whether a dimension is measured, estimated, or taken from a drawing. Avoid broad labels such as “minor” or “structural” unless they come from an identified professional evaluation.

There is no crack-width cutoff in this guide that declares a building safe. The evaluation depends on the material, structural role, condition, exposure, and surrounding construction. Similarly, a crack described as unchanged over a short observation period has not been proven permanently inactive.

Explain the decision you need

Are you documenting a change, planning a repair, responding to a home-inspection finding, or seeking information before a purchase? Include prior reports and repair records when available. A useful question is: “What additional information is needed to evaluate this condition?”

If there is suspected instability or falling material, keep people away from the affected area. Do not enter a damaged building to obtain better photographs. CDC’s disaster guidance addresses safe access after damage; a website inquiry is not an emergency response. [R-TECH-ACCESS]

Next step: Use the Photo and Observation Sheet to record location, dates, visible changes, and access limits. Request an evaluation before selecting a repair system.

Source note: CDC guidance for disaster-damaged buildings supports the access caution. The observation vocabulary and worksheet are original editorial material requiring RES technical review. The former ACI liquid-containment citation is not used as general structural-crack authority.

Documenting Drainage Problems Before Choosing a Repair

Start with where the water appears, when it appears, and what it affects. A clear record of conditions helps the project team decide what to investigate. You do not need to choose a drain, specify an excavation, or identify a final discharge location before requesting help.

Describe the event

Note whether the concern follows rain, snowmelt, irrigation, or another event. Record the date, the first place you noticed water, and approximately how long it remained. Separate what you observed from what you suspect. “Water appeared beside the basement window after rain” is an observation. “The footing drain failed” is a conclusion that may require investigation.

If the issue comes and goes, a simple event log can be more informative than a single photograph. Include occasions when similar weather did not produce the same visible problem. Do not wait for severe weather or enter flowing water to complete the record.

Show the surroundings

From safe, accessible areas, photograph the affected location and its wider setting. Include visible roof downspouts, paved surfaces, ground slopes, drains, outlets, erosion, and nearby building features where relevant. A rough sketch can connect those views and identify where each photo was taken.

Label any slope or elevation information as an estimate unless it comes from a reliable measurement or survey. A photograph may show a suspected low area without establishing a usable design elevation. Leave unknown pipe routes and concealed outlets marked unknown.

Gather records of earlier work

Existing grading plans, surveys, drainage drawings, utility information, contractor proposals, and prior reports can help explain the history. Identify recent changes such as a new patio, landscaping, downspout alteration, or work on an adjacent area. Record dates when known without assuming that the latest change caused the problem.

For flood damage, FEMA advises taking pictures or video before cleanup after safe access is established. Keep the distinction between damage documentation and a technical diagnosis. [R-TECH-PHOTOS]

Define the deliverable you need

An owner may need help identifying priorities, a written scope for comparable contractor bids, or engineered drawings for a proposed drainage system. Explain which decision comes next. If repairs will be phased, describe the budget or access constraints and ask how the investigation and design scope can support that sequence.

When contractors suggest different approaches, organize their proposals by the problem each claims to address, the work included, the assumed outlet, and the items excluded. Ask RES what information is needed to evaluate the alternatives. The cheapest line item is difficult to interpret when the proposals solve different problems.

Check the property and review boundaries

Do not assume that moving water toward a street, neighboring parcel, waterway, or existing pipe is permitted. Share the survey and known easements if available, and ask which authorities need to review the proposal. The required approvals can extend beyond a building permit.

Fort Lauderdale’s floodplain guidance, for example, includes grading and filling among regulated development activities within the floodplain. That local example does not establish requirements for another city or determine whether your parcel is in a floodplain. [R-FTL-FLOOD]

Next step: Prepare a short event log, a labeled sketch, and available site records. State whether your immediate goal is understanding the concern, prioritizing work, obtaining comparable bids, or preparing permit documents.

Sources: FEMA Flood Recovery Checklist; Fort Lauderdale Floodplain Management Regulations. Remaining steps are proposed RES preparation guidance.

What Epoxy Injection Can and Cannot Resolve

Epoxy injection is one possible method for repairing suitable cracks in concrete. The useful starting question is not “Which epoxy should I buy?” It is “What caused the crack, what must the repair accomplish, and is this method appropriate for the condition?”

Establish the objective

A repair may be intended to restore bonding, manage leakage, address deterioration, or improve appearance. Those objectives are not interchangeable. ACI’s RAP-1 bulletin discusses structural crack repair by epoxy injection and emphasizes evaluating the cause and purpose before selecting the method. It also identifies limitations where movement continues. [R-TECH-EPOXY]

Tell the engineer what prompted the request. Include prior evaluations, visible changes, moisture observations, and any repair already attempted. “The crack still leaks after patching” describes a useful history without deciding which system is needed next.

Ask about conditions that affect selection

Access, the concrete’s condition, moisture, and the geometry of the crack can affect a repair procedure. A product that suits one installation is not automatically suitable for another. Manufacturer guidance should be read for the selected product and checked against the engineer’s repair requirements. [R-TECH-PRODUCT]

If the condition has been called active or dormant, ask what observations support that description. One photograph cannot establish how a crack behaves over time. Keep the observations and the conclusion separate in the records you send.

Understand the process without turning it into a recipe

A project repair procedure typically identifies evaluation, preparation, application, curing, and verification steps. The actual product, equipment, temperatures, pressures, and acceptance criteria belong in the specified procedure and current manufacturer instructions. This article intentionally does not give installation settings or a universal crack-size threshold.

TxDOT’s concrete repair guidance emphasizes the skill involved in pressure injection and the need for qualified repair work. Its procedures are written for its own repair context; they are not residential permit requirements. [S-TXDOT]

Compare proposals by scope

Ask each repair contractor to identify the area included, product proposed, preparation assumptions, access needs, and what happens if the observed condition differs from the proposal. Ask how the work will be documented and how any specified verification will be coordinated before the repair is concealed.

Be clear about the promised result. A proposal describing injection should not be read as an investigation of every possible source of water, movement, or deterioration unless that work is included. Ask the engineer to explain any additional evaluation or repair scope that remains necessary.

Prepare five questions

  1. What is known about the cause, and what remains uncertain?
  2. Is the proposed objective structural repair, water control, appearance, or a combination?
  3. What information supports the selected system for these conditions?
  4. Who will review unexpected conditions or proposed substitutions?
  5. What records and verification are required before the work is covered?

These questions help define a repair conversation. They do not establish that injection is appropriate for the property. Keep people away from areas with suspected instability or falling material while obtaining appropriate assistance.

Next step: Send the available condition record and any proposed repair scope to RES for review before selecting a project-specific repair.

Sources: ACI RAP-1, printed p.4; Simpson Strong-Tie Crack Injection Guide; TxDOT Pressure-Injected Epoxy guidance. These have different purposes and do not replace a current project specification.

Preparing for Deck, Retaining Wall, Pool, or Waterfront Engineering

Outdoor projects share an important starting point: the proposed structure has to be understood in relation to the site. Before requesting a design, gather the available survey, a simple description of the work, and any selected system or manufacturer information.

Begin with a common project record

Identify the property, intended use, approximate location of the work, and whether it is new construction, replacement, or repair. Share existing drawings and permit comments when available. Mark unknown boundaries, utilities, elevations, and soil information as unknown.

A photograph can show the setting, while a survey may establish dimensions, boundaries, and elevation references that a photograph cannot. Tell the project team the date of each record and whether the property has changed since it was prepared. Do not combine dimensions from unrelated revisions without explaining the difference.

For a deck, describe the whole arrangement

Show its relationship to the house, ground, stairs, doors, and occupied space below. State whether you intend to retain any existing framing or supports. Identify a proposed roof, screen enclosure, hot tub, heavy finish, or other feature that should be considered in the scope rather than added as an afterthought.

Provide the proposed decking and guard information if selected. A prescriptive deck guide can have important limits. AWC DCA 6, for example, is based on the 2015 IRC and addresses a defined range of wood decks. It is not a ready-made design for every current project. [R-TECH-DECK]

For a retaining wall, show what is on both sides

Describe the visible grade difference and the proposed wall alignment. Include nearby structures, driveways, fences, slopes, and drainage features. State which dimensions are surveyed and which are estimates. Photos from accessible areas can help explain the setting; do not excavate behind a wall to obtain information for an inquiry.

Ask the team what survey, subsurface information, drainage evaluation, property-line coordination, and permit documents are needed. A wall’s appearance does not establish its foundation arrangement or remaining capacity.

For a pool, identify the system and the boundary of the supplier’s work

Provide the manufacturer and model for a prefabricated shell, or the available plans for a site-built pool. Identify the proposed location, surrounding deck, retaining conditions, nearby foundations, and any separate equipment or cover structure.

Ask who is responsible for the shell, supporting site conditions, surrounding structures, and required permit submissions. Do not assume that choosing a particular shell material removes engineering or permitting needs. Conversely, do not assume RES must redesign a complete manufacturer system. Start with the actual documents and the authority’s request.

For waterfront work, preserve the elevation reference

Send the survey with its named vertical datum, existing structure records, available permits, photographs, and a description of proposed use. Identify whether the work concerns a seawall, cap, dock, piles, or another component. Keep existing and proposed elevations tied to their documented reference; an unverified datum conversion can make a comparison misleading.

Waterfront review can involve more than one authority. Miami Beach’s seawall guide identifies DERM approval in addition to a building permit, and its environmental FAQ requests itemized cost information to evaluate seawall elevation provisions. Those are local starting points, not a universal cap height or a complete approval list. [R-MB-SEAWALL; R-MB-COST]

Next step: Select the project type in the planner and list the records and product decisions you already have. Ask RES to confirm the engineering scope before ordering or beginning work.

Sources: AWC DCA 6; Miami Beach Interactive Permit Guide; Miami Beach Environmental Permitting FAQs. Preparation prompts are proposed editorial guidance, not site design instructions.

Finding the Right Permitting Authority and Code Edition

Start with the parcel, the work, and the permit history. A mailing city is useful contact information, but it may not identify the authority that reviews construction at the property. A code year found online is also incomplete without knowing when and how it applies.

Confirm the authority for the property

Use official property records, jurisdiction maps, or confirmation from the relevant department. Save the source and date of the confirmation. If a property is unincorporated, its county may provide building review even when the postal address uses a nearby city name.

Miami-Dade’s application guide illustrates the distinction: its county building-permit path is for unincorporated properties, while municipalities have their own building officials. The same county also performs regional reviews for some work inside municipalities. A county referral therefore does not necessarily replace the city permit. [R-MD-SCOPE; R-MD-COUNTY]

Identify the review topic

Ask which department handles the specific issue: building, planning and zoning, drainage, floodplain, environmental review, utilities, or fire. One project can require several reviews. Record each authority’s role instead of assigning every question to a single generic “AHJ.”

For example, a structural drawing may address the proposed construction while a separate review addresses site placement or environmental impacts. Obtain the actual request when a reviewer asks for engineering information. Keep the full comment, permit number, and affected drawing reference together.

Match the code to the application history

Look for the official adoption instrument, local amendments, transition policy, and any requirements tied to application completeness or permit status. Distinguish the date a document was published, the date a rule became effective, and the date that determines its applicability to the project.

Denver’s transition policy distinguishes a first complete construction-document submission from certain older accepted applications and later revisions. An early upload alone does not establish the right to remain under an earlier code. [R-DEN-NEW; R-DEN-OLD; R-DEN-INCOMPLETE]

Jefferson County provides another useful example: its residential supplement has a June 30, 2026 effective date but applies to permit applications after June 30. These dates describe different parts of the rule and should not be collapsed into one undifferentiated date. [R-JEF-DATE]

Check amendments and project conditions

The model-code edition is a starting point. Local changes, occupancy, project type, and site conditions can affect the applicable requirements. An old handout or a guide from a neighboring city may be useful background but should not control the project without verification.

Avoid treating a recently accessed page as newly effective law. Similarly, a proposed code update is not proof that the final rule has taken effect. When official sources disagree, record the disagreement and ask the authority to resolve it before relying on the answer.

Ask for the procedure when a number depends on the site

For design loads, setbacks, soil assumptions, flood elevations, or waterfront elevations, ask what official lookup and professional interpretation are required. A generic citywide number may omit material conditions. Give the engineer the survey, parcel information, project description, and permit dates needed to establish the proper basis.

Next step: Use the Permit and AHJ Record Sheet to capture the confirmed authority, application history, official links, and unanswered questions. The RES assistant can help organize that record; substantive requirements still need approved, applicable evidence.

Sources: Miami-Dade permit guide; Miami-Dade permit FAQs; Denver transition policy; Jefferson County supplement. Local examples remain subject to the review restrictions in the accompanying dataset.

Engineering terms

Finding the Authority Having Jurisdiction

An authority having jurisdiction, or AHJ, is the agency responsible for a particular approval or enforcement decision.

A property can involve more than one authority. A city building department may review the building permit while a county or another agency reviews environmental, utility or floodplain matters. The city in a mailing address is a useful starting clue, but it is not proof of the governing boundary. Record the parcel identifier and the agency that confirmed jurisdiction. Keep building, zoning and environmental contacts separate so a statement from one office is not treated as approval from every office.

Example: A waterfront project may involve a city building permit and separate environmental review.

Next step: Confirm the parcel and proposed work with the responsible agency.

Limit: Do not infer an exemption or governing agency from a ZIP code.

What a Load Path Means

A load path is the connected route by which forces travel through a structure to its supporting ground.

A member is only part of that route. Its connections, supports and the elements below them matter too. This is why a proposed opening can require investigation beyond the wall being removed. Drawings may show a beam clearly while leaving the capacity of an existing support unresolved. Explain which spaces should remain open and provide available records of the framing above and below; the engineer determines the complete arrangement.

Example: A new opening can change where forces arrive at the supports below.

Next step: Describe the opening and gather existing drawings, without opening finishes yourself.

Limit: This explanation cannot size a beam, connection or footing.

Why Wall Appearance Is Not Enough

A finished surface does not establish whether a wall carries structural loads or serves another structural function.

Treat labels such as partition, bearing wall and shear wall as questions to resolve when records are incomplete. A sketch can show the intended opening and adjacent rooms, but it cannot document concealed connections or verify existing construction. Tell the engineer what is known from drawings and what is only a recollection. Investigation, if needed, should be planned with the responsible professionals before demolition.

Example: A former owner calling a wall nonbearing is reported history, not verified evidence.

Next step: Send the intended layout and available plans; flag uncertain information.

Limit: Do not remove structural material to answer an intake question.

Observation, Report and Design

A site observation, a written report and construction design are different scopes of work.

An observation records accessible conditions within an agreed scope. A report communicates findings and limitations for a stated purpose. Design documents describe proposed work and its engineering basis. One engagement may include several of these, but none should be assumed from the word inspection. Explain who will use the deliverable: an owner deciding next steps, a contractor pricing work, or an agency reviewing a permit. Ask RES to define the deliverable in the proposal.

Example: A preliminary drainage discussion and permit-ready drainage design can require different records and effort.

Next step: State the decision the document must support and any agency request.

Limit: These are proposed scope explanations, not promises about an existing RES contract.

Useful Existing Project Records

Existing drawings and reports help describe a project, but their status and date matter.

Gather available architectural and structural drawings, surveys, soils reports, prior engineering letters, permit comments and product information. Label each item with its date and whether it is approved, proposed or superseded. A drawing of proposed work is not proof that the work was built that way. Missing records are useful information too: mark them unavailable rather than recreating facts from memory. Share only documents you have authority to provide.

Example: Keep an approved plan separate from a contractor markup proposing a change.

Next step: Create a short document list and identify the newest known revision.

Limit: Records do not replace verification where existing conditions are uncertain.

What a Soils Report Contributes

A geotechnical report addresses ground conditions and recommendations within a defined investigation scope.

Before using a report, identify its site, author, date and intended project. A nearby property report or an old report for a different improvement is not automatically applicable. For intake, provide the whole available report, including appendices and later letters, and state whether the planned work has changed. The design team determines whether additional investigation or updated recommendations are needed. Agency document requirements also depend on the project type.

Example: A report prepared for a previous building may need review before a new addition relies on it.

Next step: Send the complete available report and explain the proposed work.

Limit: No default soil capacity, soil classification or foundation recommendation is assigned here.

Reading an Elevation Datum

An elevation needs a reference datum before it can be compared meaningfully with another elevation.

Look for the survey title, date, units, benchmark and vertical datum. NGVD 29 and NAVD 88 are different reference systems. Their difference is location dependent, so a remembered offset from another property is not a reliable conversion. Keep the original reported elevation and datum together. Ask the surveyor or responsible professional to establish a documented conversion when different records must be compared.

Example: A proposed seawall elevation and an existing survey elevation may use different datums.

Next step: Provide the survey and source of the proposed elevation requirement.

Limit: No conversion value, flood elevation or required seawall height is supplied.

Which Date Determines the Code?

Code applicability can depend on the agency’s transition policy and permit history, rather than today’s date alone.

Separate an ordinance adoption date, its effective date and the date a new code applies to permit submissions. Some policies distinguish a complete accepted application from an incomplete upload, or address revisions and ongoing permits separately. Save the agency receipt, completeness notice, permit number and prior code notation. If those records are missing, the correct response is to clarify the history rather than choose the newest or oldest edition.

Example: Denver transition policy distinguishes complete submissions and older accepted logs; Jefferson County separately states effective and application dates.

Next step: Give RES the dated intake and permit records for the actual project.

Limit: Local rules cited as examples remain pending approval; no edition is assigned to a visitor’s project.

Preferences and Design Constraints

A preference describes the desired outcome; a constraint identifies a condition the design must address.

Examples of preferences include exposed wood, a concealed beam or a particular appearance. Examples of constraints include fixed ceiling height, access limits or equipment already selected. Mark each item as essential, preferred or open to alternatives. This helps the team discuss tradeoffs before details are developed. A preferred material still needs evaluation for the actual loads, connections, exposure and construction sequence.

Example: A flush ceiling is an architectural objective, not confirmation that a flush beam is feasible.

Next step: Prepare a short ranked list of priorities before design begins.

Limit: No material is presented as universally cheaper, stronger or better for the project.

Describing Change Without Diagnosing It

A useful crack record describes what was observed and when, without guessing its cause or safety significance.

Identify the surface, room or exterior location, direction, visible offset, moisture and changes noticed over time. Use dated photographs taken from a safe position, with a wider view that establishes location. Clearly separate measurements from estimates and recollections. A single width or photograph cannot establish a repair plan. Avoid covering or altering evidence just to improve the photograph; the engineer can explain what additional information is needed.

Example: “First noticed after the storm” records timing; it does not prove the storm caused the crack.

Next step: Record dates and visible changes and request an appropriate review.

Limit: Do not approach unstable areas; the assistant cannot determine structural safety.

Product Approval and Project Suitability

A product approval or manufacturer guide must be checked against the specific product, installation and project.

Record the manufacturer, model, approval identifier and document revision. Keep the complete document, including limitations and installation conditions. A brand name alone does not establish an interchangeable substitute. If a contractor proposes a change, identify the specified item and proposed replacement and request review before use. Where an approval identifies a code edition, that edition is part of the applicability check.

Example: A Florida product approval may have limits that do not match the proposed assembly.

Next step: Provide both complete product documents and describe the requested change.

Limit: Do not state that an approval automatically authorizes every installation.

Planning Observation and Inspection Records

Coordinate required inspections and any engineering observations before work is concealed.

Ask the authority and design team which inspections apply, who performs them and what records must be submitted. A contractor photograph, an engineer’s observation and a required agency or special inspection are different records; one is not automatically a substitute for another. If an inspection was missed, identify the stage of work and the authority’s written request. The appropriate response depends on what can be verified and what the agency accepts.

Example: Photos of completed work may not show concealed conditions requested by an inspector.

Next step: Keep the approved plans, inspection history and written request together.

Limit: No promise is made that photos or a letter will resolve a missed inspection.

Questions

What is RES’s full name, and when was it founded?

RES is the short name for Ruffini Engineering Services LLC. The firm was founded in 2015. These identity facts do not establish a particular professional license or the scope available for your project.

Helpful next question: What type of project are you planning?

Where are the offices and what are the hours?

The Colorado office is at 200 Union Boulevard, Suite 200, Lakewood, Colorado 80228. The Fort Lauderdale address is 501 East Las Olas Boulevard, Suite 300, Fort Lauderdale, Florida 33301. Office phone hours are weekdays from 9:00 a.m. to 5:00 p.m. local time. Call the Florida team at (954) 228-3202 before visiting or mailing plans.

Helpful next question: Which office or project location is relevant?

What kind of engineering help should I request?

Describe the property, the work or concern, and the decision you need help making. For example, distinguish documenting an existing condition from designing a change or responding to permit comments. If you are unsure, explain the outcome you need in ordinary language; RES can confirm whether the scope fits its services.

Helpful next question: What would you like to be able to decide or do after the work?

What will the work cost and how soon can it be done?

A useful proposal starts with the project location, scope, available records, required deliverable and any deadline. Fees, schedule and availability need confirmation from RES for the actual work. A website answer or a preferred date does not reserve an appointment or establish a quote.

Helpful next question: What deliverable do you need, and is the deadline set by an agency or another party?

What should I send before the first discussion?

Start with a short description, the project address, available drawings and reports, and any written request from an authority. Add a few clear photographs that show context if they can be taken safely. Mark missing records as unavailable and identify which information is measured, estimated or reported by someone else.

Helpful next question: Do you have existing plans or a written permit comment?

Can photographs replace an engineering visit?

Photographs can help explain a concern and support initial scoping. They may not show concealed construction, dimensions, connections or other information needed for a conclusion. RES must decide what can be evaluated from the records and whether a visit or other investigation is needed. Sending photographs does not establish that the condition has been inspected or accepted.

Helpful next question: What decision do you need the photographs to support?

Is the condition in this picture safe?

A photograph cannot establish structural safety. If you suspect immediate danger, keep away from the affected area and contact local emergency services or the appropriate local authority. Do not enter a hazardous area to gather more pictures. For other concerns, contact RES to determine an appropriate evaluation; this assistant cannot issue a safety determination.

Helpful next question: Are you describing an immediate danger or requesting a scheduled evaluation?

Can you give me the beam size or exact repair?

Member sizes, reinforcement, connections, foundations and repair details require a project-specific engineering evaluation. Describe the intended work and provide available plans and site records so RES can define the needed scope. A generic example or an online answer should not be used as construction instructions.

Helpful next question: What are you changing, and do you already have approved plans?

How wide does a crack have to be before it matters?

There is no crack-width threshold in this library that can determine safety or select a repair for every condition. Record its location, visible pattern, moisture and changes over time. Width is one observation; it does not establish cause or significance by itself. Avoid approaching an unstable area to measure it.

Helpful next question: When was it first noticed, and what changes have you observed?

Will epoxy injection solve my crack problem?

Epoxy injection may be considered for some concrete repair objectives, but suitability depends on the cause, movement, condition and specified material. It is not a universal answer for leakage or continuing movement. Preserve the existing information and ask for an evaluation before selecting a repair procedure.

Helpful next question: Is your main concern water entry, movement, appearance or a requested structural repair?

Can I remove this wall?

A finished appearance or one photograph cannot establish the wall’s structural role. Provide the intended layout and available drawings, including information about the levels above and below. The engineer can define what must be verified before a removal or opening is designed. Do not start demolition to test whether it carries load.

Helpful next question: Do you have plans showing the framing above and supports below?

Can the beam be hidden, and can I choose steel or wood?

State the desired appearance and rank what matters most: ceiling height, clear space, exposed material, access, cost or construction disruption. Mark essential requirements and preferences separately. The engineer can evaluate feasible arrangements and explain tradeoffs; a preference does not establish a suitable member or connection.

Helpful next question: Which features are essential, and which are open to alternatives?

Can the contractor substitute another product?

Provide the specified product, the proposed replacement, complete current product documents and the reason for the change. Similar appearance or a shared brand does not establish equivalence. Request review through the project’s design and approval process before installation.

Helpful next question: Has the proposed change been submitted to the responsible designer?

Does a fiberglass pool need engineering?

The pool system, manufacturer requirements, site conditions, related structures and authority’s requested scope all matter. Provide the manufacturer and model, installation information, site plan and any written engineering request. RES can then clarify whether the requested work concerns the shell, supports, retaining conditions, surrounding improvements or another issue.

Helpful next question: What exactly has the authority or pool contractor asked an engineer to provide?

Can drainage work be divided into phases?

Explain the immediate problem, the longer-term goal and the budget or access constraints. Provide available observations and earlier recommendations. Ask for a scope that identifies priorities and interactions between phases. A preliminary discussion does not establish that one measure will resolve all drainage conditions or that a later phase can safely be omitted.

Helpful next question: Do you need an initial assessment, a written priority plan or construction documents?

Do engineering drawings guarantee a permit?

Engineering documents support an application within their stated scope. The responsible agencies still review applicable building, zoning and other requirements. Keep agency comments with the current plans and identify who is coordinating each response. Do not treat a drawing seal or a completed calculation as automatic permit approval.

Helpful next question: Has the authority issued specific comments or a required-document list?

Is my mailing city the permitting authority?

A mailing city or ZIP code does not establish the permitting boundary. Use the parcel location and official jurisdiction resources, then confirm which agency handles the particular review. A county may have a separate regional role even when the building permit comes from a city.

Helpful next question: Do you have a parcel identifier or an existing permit naming the agency?

Which code applies to an older application?

The answer depends on the authority’s transition rules and the project’s accepted application and permit history. Provide the original submission date, completeness or acceptance notice, permit status and nature of the proposed revision. An old upload date alone may not establish a right to use the prior edition.

Helpful next question: Was the original application accepted as complete, and what change is now proposed?

Can an engineer’s letter replace a missed inspection?

Provide the authority’s written request, approved plans, inspection history and available construction records. The agency and responsible professionals must determine what can be verified and accepted. Do not assume a letter or photographs can replace an inspection of concealed work or a required special inspection.

Helpful next question: What did the authority specifically request after the missed inspection?

What if I do not have plans or know the answer?

Identify the missing item as unknown or unavailable and describe what you do know. Keep estimates and information reported by others labeled that way. You can still explain the project goal; RES can determine which missing records or observations are needed for the proposed scope. Do not invent dimensions, dates or permit history to complete a form.

Helpful next question: Which information is missing, and do you know who might hold the original record?

Preparation guides

Before You Contact RES

Prepare the project facts and intended outcome for an initial engineering discussion.

Read the guide
Project Photo Guide

Record visible conditions and dates from a safe position without diagnosing the cause.

Read the guide

Before you contact an engineer

More engineering FAQs
Can I contact RES before I have drawings?

Yes. Start with the location, a short description, and the decision you need help making. Tell us which plans or records you already have and which are missing.

What should I include if a city or county asked for engineering?

Include the agency’s written request, the permit or application number, and the drawing or report it references. This helps RES understand what the reviewer is asking you to provide.

Can I send photos before the first conversation?

Tell the office you have photos and describe what they show. A wider view and a close-up of the same area help connect a detail to its location. Only take photos from a safe, accessible spot.